Sauber technical director Smith left F1 team

Sauber has revealed its technical director Mark Smith left the team, with the former Caterham man returning to the UK for family reasons.

Smith joined the Swiss outfit last summer to fill a post that had been vacant since James Key’s departure ahead of the 2012 season. Before his tenure with Team Lotus (later Caterham), Smith worked at Red Bull and Force India.

Prior to hiring Smith, Sauber had restructured its organisation and worked without a technical director, relying on a committee that comprised the heads of car performance, aerodynamics and the design groups.

Driver Felipe Nasr explained over the winter that Smith was the driving force behind Sauber's different and aggressive approach in terms of design that has resulted in the 2016-spec C35.

“We would like to thank Mark for his efforts and we wish him all the best for his future”, the team said in a statement.

TECHNICAL: A closer look at the Sauber C35

F1i Classic: Melbourne 2002 - Mark Webber's dream debut

Keep up to date with all the F1 news via Facebook and Twitter

Julien Billiotte

Recent Posts

Cadillac to move from reliability to speed in Bahrain – Lowdon

After a careful shakedown in Barcelona, Cadillac team principal Graeme Lowdon has confirmed that the…

2 hours ago

Aston Martin insider says Newey-led AMR26 is ‘on another level’

Aston Martin’s 2026 challenger hasn’t turned a competitive wheel in anger yet, but inside the…

3 hours ago

Horner breaks silence: ‘I have unfinished business in F1’

Christian Horner has finally stepped back into the spotlight – and he didn’t tiptoe in…

6 hours ago

Jaguar's Evans charges from zero to hero in in Miami E-Prix

Mitch Evans arrived at Round 3 of the Formula E season with zero points on…

7 hours ago

Mercedes ‘aced it’ in Barcelona, but Brundle downplays the hype

Mercedes may have just dropped the first thunderclap of the 2026 Formula 1 era –…

8 hours ago

Team Talk: F1's shakedown week in Barcelona

Cadillac Valtteri Bottas “It’s great, but it is the problem-solving phase of the team. It’s…

9 hours ago